What if your home could help pay for itself while you enjoy a central San Antonio lifestyle? In Tobin Hill, duplexes and garage apartments offer a practical way to lower your monthly costs and build equity at the same time. You may be weighing a purchase in this classic neighborhood or considering how to unlock income on a property you already own. In this guide, you will learn the two main paths to house hacking in Tobin Hill, the local rules that matter, how financing typically works, and the steps to move from idea to income with confidence. Let’s dive in.
Why house hack in Tobin Hill
Tobin Hill sits just north of downtown San Antonio with a mix of early 20th century homes and small multifamily buildings. The central location helps support steady demand for well-located rentals. Many lots include alleys and detached garages, which can be ideal for a garage apartment or careful conversion.
At the same time, pieces of Tobin Hill fall within historic overlays. That means you balance opportunity with design review and site constraints. With the right plan, you can achieve live-in income while respecting neighborhood character and city rules.
Two paths to live-in income
You have two proven options:
- Buy a 2-unit property, live in one unit, and rent the other.
- Add an accessory dwelling unit, often called an ADU or garage apartment, to a single-family property and remain owner-occupied.
Buy a duplex and live in one
Before you write an offer, verify the property is a lawful two-unit. Ask for documentation that both units were permitted or that the use is a legal nonconforming one. Confirm separate exits, appropriate fire separation if required, compliant egress, and properly permitted utilities and meters.
Review the title work for any deed restrictions, easements, or covenants that limit rentals. In older neighborhoods, a past conversion may not match current code, so a thorough inspection is essential. Include home, pest, mechanical, and any required rental compliance checks.
For financing, many owner-occupants use FHA, conventional, or VA options that allow 2-unit properties. Lenders typically require you to occupy one unit as your primary residence. Some will consider a portion of the second unit’s rental income if you document existing leases or market rent.
Add an ADU or garage apartment
You can convert an existing garage, build a new detached unit behind the house, or create an internal accessory unit with a separate entrance. Start by confirming your zoning district allows an ADU, then evaluate historic overlay requirements if applicable.
Key compliance items include setbacks, lot coverage, and parking rules that may vary by district. Coordinate early on utilities to determine whether separate water and electric meters are required or simply recommended. Meet building and life safety code for sleeping areas, egress, ventilation, and fire separation where needed.
If you plan short-term rentals, know that licensing and enforcement rules are separate from ADU approvals. Always verify the city’s short-term rental rules before you build with that strategy in mind.
Local rules that matter in Tobin Hill
Zoning and land use
San Antonio’s zoning and land-use controls determine whether duplexes or accessory units are permitted on a given lot. Some older properties operate as lawful nonconforming uses or under conditional designations. Confirm permitted uses and whether your plan is allowed as of right or needs a rezoning or conditional approval.
Also check recorded plats and any private covenants. Even when zoning allows an ADU, deed restrictions can limit accessory apartments or rentals. Review the title report and recorded documents to avoid surprises.
Historic overlays and design review
Parts of Tobin Hill fall within historic districts, and some homes are individually designated or contributing. Exterior changes, new detached structures, and demolitions typically require a Certificate of Appropriateness. Design review often covers materials, rooflines, setbacks, massing, and visibility from the street.
Expect the historic review to add weeks or months to your timeline. The best practice is to consult the City’s Historic Preservation Office early for a staff pre-application meeting. Bring simple massing sketches that show the location, height, and visibility of your proposed ADU.
Parking, access, and alleys
Off-street parking can be required depending on zoning or overlay rules. Many Tobin Hill parcels have rear alleys that make garage apartments more feasible. Others do not, which can affect where you place a detached unit and how you meet any parking standards.
If you are converting a garage, verify that driveway access remains functional and that any new parking areas meet historic guidelines if you are in an overlay. Some districts place limits on new visible parking pads in the front yard.
Utilities, sewer, and floodplain
Confirm water, sewer, and stormwater capacity before you commit to a design. Older lines sometimes require upgrades to support an additional dwelling. Contact the local utility provider to understand connection logistics and any capacity or assessment fees.
Check FEMA flood maps for the parcel. Building in a floodplain may require elevated foundations and floodproofing. Budget for these design requirements if your site is impacted.
Lot patterns and site fit
Tobin Hill and other central neighborhoods in San Antonio were often platted with narrow lots and moderate depths. Typical historic widths commonly range around 40 to 50 feet, with depths often 120 to 140 feet. Your recorded plat will confirm the exact dimensions for the property you are considering.
Narrow or shallow lots can influence where a detached ADU fits, setback compliance, and overall lot coverage. A quick sketch overlay of the plat with required setbacks helps you test locations before you spend on design drawings.
Budget, financing, and returns
Financing a 2-unit purchase
Owner-occupants often use FHA, conventional, or VA financing when buying a duplex and living in one unit. Down payment and underwriting vary by lender and investor guidelines. Many lenders will consider a portion of market rent from the second unit if you document it through a lease or comparable rents.
Financing an ADU or conversion
Common tools include renovation or construction loans, cash-out refinance, or a HELOC. Options like Fannie Mae HomeStyle or FHA 203(k) can fund eligible single-family renovations. Construction loans may convert to permanent financing after completion.
San Antonio programs may offer housing or rehabilitation incentives from time to time. Ask about owner-occupied rehab options if your project improves safety and livability. Match your financing choice to your timeline and the level of construction risk you want to carry.
Cost expectations
Costs vary with scope, finishes, whether you convert an existing garage or build a new detached unit, and whether historic-style materials are required. A modest garage conversion can be in the tens of thousands of dollars. New detached ADUs typically cost more due to foundation, utilities, and full code compliance.
Request written estimates from local contractors who understand historic contexts. Ask for line-item scopes that include utility connections and any required upgrades so you can compare apples to apples.
Cash flow and ROI basics
Estimate potential rent using nearby listings for comparable unit types. Use conservative assumptions for vacancy and operating expenses, including taxes, insurance, maintenance, and management if applicable. A simple test compares the net rent from the second unit to your mortgage, taxes, and insurance to see how much your housing cost could drop.
Beyond dollars, consider non-financial benefits. You can live close to work and entertainment, reduce commute time, and let rental income help with principal paydown. Over time, this can accelerate equity growth while you enjoy the neighborhood.
Step-by-step path and timeline
Pre-purchase feasibility, days to weeks
- Pull the parcel plat and legal description.
- Confirm zoning and permitted uses for duplex or ADU.
- Check historic district maps and ask if the home is contributing or individually designated.
- Review recorded deed restrictions and any covenants.
- Order a full home inspection and a basic utility capacity check for water and sewer.
- Obtain a pre-approval that supports an owner-occupied 2-unit purchase if that is your route.
Design, permits, and approvals, 1 to 6 plus months
- Engage an architect or designer early if adding an ADU or detached structure.
- Prepare drawings that consider historic guidelines, setbacks, and lot coverage.
- Apply for building permits and any required Certificates of Appropriateness.
- Coordinate utility permits and account for any connection or capacity fees.
- Plan the build sequence from foundation to final inspections and occupancy.
Occupancy and rental setup
- Secure a Certificate of Occupancy or final inspection before renting any unit.
- Use written leases that comply with Texas landlord-tenant law and any city rental requirements.
- If you intend short-term rentals, confirm local licensing and taxes before marketing the unit.
Risk checklist to manage
- Unpermitted units that create legal and insurance exposure.
- Unexpected infrastructure needs, such as sewer or water upgrades.
- Deed restrictions or HOA rules that limit ADUs or rentals.
- Underestimating construction costs or overestimating achievable rents.
A careful feasibility review and early talks with city staff help you mitigate these risks before you commit capital.
Who to contact
- City of San Antonio Development Services for permits, zoning, and building codes.
- City of San Antonio Historic Preservation Office for historic district status and design review.
- Bexar County Clerk and the Appraisal District for plats, property records, and recorded covenants.
- San Antonio Water System for water and sewer connection capacity.
- FEMA flood maps for floodplain checks and elevation details.
- Mortgage lenders familiar with owner-occupied 2-unit and renovation financing.
- Local architects and contractors experienced with historic properties and accessory units.
Make it work with a trusted guide
House hacking in Tobin Hill rewards preparation. When you confirm zoning, respect historic character, plan utilities, and choose the right financing, you can transform a classic property into a home that helps fund itself. A thoughtful process gives you both income potential and the central-city lifestyle you want.
If you are ready to explore duplexes or garage apartments in Tobin Hill, connect with a local advisor who can coordinate feasibility checks, introduce experienced designers and contractors, and manage the details from search to closing. When you want a calm, concierge experience that respects your time, reach out to Unknown Company to Request Your Free Relocation Kit.
FAQs
Can I live in one unit and rent the other in Tobin Hill?
- Often yes, but you should verify zoning, the lawful status of both units, and any recorded covenants before you purchase or lease.
Will a historic district stop me from building a garage apartment?
- Not necessarily, since many historic areas allow compatible accessory buildings, but you will need design review and a Certificate of Appropriateness.
Do I need separate meters for an ADU in San Antonio?
- Requirements vary by project, and separate meters may be required or simply recommended, so confirm with utility providers and the city code.
How long do permits take for an ADU in Tobin Hill?
- Simple interior conversions can move in weeks, while new detached units in historic overlays often take months due to design review and revisions.
What are the biggest risks with a duplex or ADU project?
- Unpermitted work, hidden utility upgrades, restrictive covenants, and inaccurate cost or rent assumptions are the most common pitfalls to plan around.